Find or Sell Motorcycles & Scooters in USA

2014 Bmw R1200 Gsw Standard on 2040-motos

US $20,015.00
YearYear:2014 MileageMileage:10 ColorColor: FR BLUE
Location:

Chattanooga, Tennessee, US

Chattanooga, TN, US
QR code
2014 BMW R1200 GSW  Standard , US $20,015.00, image 1

BMW Other photos

2014 BMW R1200 GSW  Standard , US $20,015.00, image 2 2014 BMW R1200 GSW  Standard , US $20,015.00, image 3 2014 BMW R1200 GSW  Standard , US $20,015.00, image 4 2014 BMW R1200 GSW  Standard , US $20,015.00, image 5 2014 BMW R1200 GSW  Standard , US $20,015.00, image 6 2014 BMW R1200 GSW  Standard , US $20,015.00, image 7

BMW Other tech info

TypeType:Standard Stock NumberStock Number:1768 PhonePhone:8883322365

BMW Other description

2014 BMW R1200 GSW, 2014 BMW R1200 GSW

Moto blog

Crank(er) up the volume

Fri, 06 Jan 2012

Want to listen to your tunes on the go but don't want to wear earplugs? Well this new Sportech Cranker tankbag could be for you. It features an integrated speaker and amplifier and runs off 4xAA batteries.

Moto 3, Oral Engineering and the 2012 BMW S1000RR

Thu, 01 Mar 2012

KTM and Honda may have been the main players at recent Jerez Moto 3 test but GP newcomers, Oral Engineering, weren’t too far behind with our very own Danny Webb posting the 15th best time. Italian based Oral are supplying engines to Mahindra Racing (Danny & Marcel Schrotter) and Ambroggio Next Racing (Simone Grotzki & Giulian Pedone). Mahindra have their motor housed in an all new, Italian tubular steel chassis, while Ambroggio have gone down the more economic route of using their 2011 Aprilia RSW 125 chassis.

FIM Updates Superbike Racing Homologation Lists for 2013

Tue, 19 Feb 2013

The International Motorcycling Federation (FIM) has released an updated list of motorcycles homologated for the 2013 Superbike, Supersport, and Superstock racing season. Notable additions include the new BMW S1000RR HP4, the MV Agusta F3 and the Superbike-spec Ducati 1199 Panigale R. To qualify a production-based racebike for FIM homologations, manufacturers have to meet certain production thresholds.